Municipal services have a huge community impact, and their successful delivery depends on functional infrastructure. Capital projects work to maintain service levels by replacing or repairing expensive assets like trucks, buildings, and roads. They support the continued delivery of existing services or an increase in service levels. For the list of significant projects worked on or completed in 2026, please see the table below.
For our annual budget, which includes the full budget for our capital projects, please visit our Financial Report webpage, linked below.
Financial Report Webpage
For more information on our Water capital projects, please visit our webpage on this, linked below.
Water Capital Projects Webpage
For more information on our Wastewater capital projects, please visit our webpage on this, linked below.
Wastewater Capital Projects Webpage
Capital Projects In-Progress and Completed in 2026
| Department | Description | Reason |
|---|---|---|
| Equipment | Dump Truck | Equipment nearing end of life. |
| Hot Springs | Loading Door | Process improvement: Existing door not wide enough for deliveries on a pallet e.g. for chlorine barrels. |
| Hot Springs | Campground resurfacing | Poor condition: No gravel left to grade. |
| Hot Springs | Upper Parking Lot stormwater improvements | Process improvement: Drainage sloped in way that caused issues downstream. |
| Hot Springs | Facility drains āPā trap replacements | Poor condition: metal pipes showing signs of deterioration. |
| Hot Springs | Commercial Laundry Equipment replacement | Poor condition: existing machines regularly breaking |
| Parks | High Voltage System upgrades | Poor condition: regulatory inspection required mandatory equipment replacement |
| Parks | Sani Station Upgrades | Process improvement: existing location and equipment created issues with road use and spill management |
| Roads | Wayfinding Signage | Economic development |
| Roads | Road Paving | Poor condition: repaving sections where the asphalt has failed. |
| Roads | Winter Sand Shed | Process improvement: keeping sand dry puts less strain on the equipment and spreads better. |
| Roads | Sidewalk Replacement | Poor condition: inspection reports identified areas that were at the end of their life. |
| Sewer | SCADA Upgrades | Poor condition: existing equipment is outdated and buggy. |
| Sewer | DAF Plant Improvements | Malfunction: existing equipment needed upgrading to move the sludge properly. |
| Sewer | Lift Station backup pump | Emergency preparedness |
| Sewer | Lift Station control upgrades | Poor condition: existing equipment is outdated and buggy. |
| Sewer | Pipe inspection camera | Poor condition: Existing camera was broken. |
| Sewer | WWTP Optimization Project | Process improvement: better aeration and headworks screening. |
| Sports Complex | Emergency Reception Center (Auditorium HVAC) | Emergency preparedness |
| Stormwater | Green Water Infrastructure Plan | Process improvement: designs better options to manage rainwater on boulevards. |
| Water | WTP UV Disinfection system replacement | Equipment no longer supported |